显示标签为“Clermont”的博文。显示所有博文
显示标签为“Clermont”的博文。显示所有博文

2012年3月29日星期四

Nalgonda village pioneers solar power revolution

At a time when the entire state has plunged into darkness due to unscheduled and prolonged power cuts, Nalgonda is gearing up to become a shining example of a power cut-free district. As a first step to achieve the distinction, Pagidipalli village in Bibinagar mandal in the district has successfully put behind power cut woes by installing solar panels.

Funded by the Bureau of Energy Efficiency (BEE), the pilot solar scheme was launched in Pagidipalli a year ago. As part of the initiative, 63 solar stand-alone streetlights and 360 8-watt light emitting diode (LED) bulbs have been installed in the village at a cost of Rs15 lakh.

Pagidipalli has 230 households with a population of 1,500, majority of whom are either farmers or those who work in the surrounding factories.

This automatic system can provide light for 12 hours in the night. BEE distributed LED lamps to the households at 50% subsidy. "We don't have much problem in using them. If we face any problem with solar panels, Nedcap which has supported the initiative helps us," Ch Chandrasekhar, a villager, told TOI. He says that there is 70% decrease in their electricity bill after they started relying on solar power and LED lamps.The village panchayat played an active role in convincing the people to use solar bulbs when there was some resistance to the proposal. "Not just villagers but the village panchayat has also benefited from this. We are saving Rs 1 lakh per year ever since we switched over to this programme," V Venkatesh, former sarpanch, told TOI. Buoyed by the success, officials are planning to implement a similar project in Miryalaguda at a cost of Rs 5 crore.

The municipality is willing to allocate Rs 2.5 crore. Officials are mulling offering subsidy for those who are willing to take solar power connections. "We will hold discussions with the stakeholders including the residents of the town before implementing the project," Neelakantham, in-charge joint collector, said.

2012年2月2日星期四

Solar panel returns could be cut by 80pc

The Government is proposing to make full payments from "feed-in tariffs" conditional on homes meeting energy efficiency standards. The change would come into effect on April 1.

Currently, householders receive 43.3p per kWh of electricity generated. The Government will cut this rate for new installations to 21p in April, after an attempt to impose the cut sooner was thrown out by the courts. Unless that ruling is overturned on appeal, anyone who completes their installation before 3 March will still receive the higher rate.

But the proposal to link the payments to the overall energy efficiency of the property could see some solar panel owners receive just 9p – which is 79pc less than 43.3p – if their homes fail to meet the standard. The Government is still consulting about the plans, which would not affect installations completed before April.

The Energy Saving Trust said: "Where a domestic property does not meet these energy efficiency requirements, the solar PV [photovoltaic] installation may receive the lower tariff of 9p/kWh."

It added: "The Government is consulting on two alternative proposals: that the owner or occupier should bring the property up to an Energy Performance Certificate (EPC) rating of level C or above; or that the owner or occupier of a building should undertake all the measures that are identified on an EPC as potentially eligible for Green Deal finance, with no additional finance required.

"The Government wants to ensure that PV is considered as part of a whole house approach which prioritises energy efficiency."

A spokesperson for the Department of Energy and Climate Change (DECC) said: “It makes sense that, if someone is putting solar panels on their building, the property is energy efficient too. We consulted on the best ways of doing this by linking tariffs to specified minimum energy efficiency requirements and proposed introducing such a requirement from April 1. We’ll publish our final proposals by Feb 9.”

Despite losing its legal case in the Court of Appeal last week, the generation tariff rate for units installed after December remains at 21p per kWh as DECC is now escalating its appeal to the Supreme Court. If this case is unsuccessful home owners who installed units between December and March this year will revert to the higher tariff  and will receive backdated payments so they are not out of pocket.

But those installing units now should not assume they will automatically get this higher rate.

2012年1月10日星期二

Martinez school board to spend $6.2 million on solar panels

With school funding threatened every year by state budget shortfalls, Martinez school board members hope a $6.2 million investment in solar panels will pay off by reducing energy costs and thereby freeing up money for the district's other needs.

Four board members on Monday agreed to spend the money to install solar panels. John Fuller abstained from voting.

According to an analysis by the solar contractor, the school district will save an estimated $475,000 in the first year the panels are up and running. Superintendent Rami Muth said the solar project will allow the district to control its own destiny by providing a stable source of funds.

"This is going to give us another way to be able to weather those (state budget) storms," Muth said.

The total savings are a combination of lower electricity bills and rebates through the California Solar Incentive program. Through the rebate program, which PG&E runs, the school district will receive 12 cents per kilowatt hour of energy the solar panels produce. If energy costs increase over time, the district could save even more.

The money for the solar project comes from the $45 million bond voters approved in 2010. The board has issued about $25 million in bonds so far. Taxpayers will pay about $2.33 for every dollar in bond funds the district spends, according to Aaron Jobson, of Quattrocchi Kwok Architects.

The solar panels are scheduled to be installed later this year. The solar contractor will guarantee for 10 years that the panels will produce at least 95 percent of the energy they are capable of producing.

The company also will perform routine maintenance on the panels during the 10-year period. The panels come with a 25-year manufacturer's warranty and have a life expectancy of 40 years, Jobson said.

The board has separated the proposed bond projects into three phases. In addition to the solar panels, the first phase includes districtwide technology infrastructure upgrades, additions to the performing arts building and gym at Alhambra High School, a remodeled kitchen at Las Juntas Elementary School, and minor improvements at the Vicente Martinez High School and Briones Independent Study School campus.

However, board member Kathi McLaughlin expressed concern about delaying reconfiguring the driveway and parking lot at Las Juntas and renovating the Vicente Martinez and Briones campus until the second phase.

She urged the board find ways to cut costs on some of the other first-round projects or to find another funding source for the solar panels so the Las Juntas and Vicente projects can be completed in the first round.

The $45 million bond will be repaid over 25 years at a total projected cost of $99 million. Martinez property owners are paying nearly $62 per $100,000 of assessed valuation to repay $48 million in existing school bonds.

2011年12月29日星期四

Solar power use expands in South America

Latin America is investing more in solar power but, in line with International Energy Agency warnings, needs to do so intelligently and without multiplying costs.

Poverty-stricken Honduras is the latest home to solar energy projects in Central and South America that are driven by U.S. service providers but fitted out with Chinese-made equipment.

Colorado's Onyx Service and Solutions Inc. said it will install its newest solar energy project in Latin America, made up of Chinese-manufactured solar panels and associated equipment, at West Bay Lodge Project in Roatan, Honduras.

Onyx Management is also using Honduran personnel for the installation which fulfills a need for electricity supply expansion in the Central American country.

Honduras was severely affected by a coup in 2009 that triggered an international diplomatic, political and economic isolation of the country. Recovery has been slow despite assistance from the European Union and the United States.

The West Bay Lodge installation follows a deal reached in October to power the resort, part of the government's plan to regenerate the economy with tourism. The West Bay Beach is the most popular tourist destination on the Island of Roatan, and an international tourist destination.

Onyx said in deciding on the project it took a different course than most other solar companies, choosing to forgo competition against coal-fired electricity producers or depending on government subsidies to make a profit.

After a detailed research of the worldwide markets for power, Onyx said, it focused on sectors that relied on costly diesel generated electricity such as that in Roatan at present but offered opportunity for greater profit margins. Onyx is developing multiple solar power projects in Honduras, one as large as 22 megawatts, and Panama. The company is developing solar power distribution in Colombia and Peru.

Solar power generation and distribution is set to grow in Latin America and has enabled U.S. renewable energy companies to position in the area.

Last month scientists at Notre Dame University in Indiana announced they devised an inexpensive "solar paint" that can produce energy.

The paint, dubbed Sun-Believable, may someday be applied to homes to generate electricity from light to power appliances and equipment inside.

The paint uses semiconducting nanoparticles to produce energy from sunlight.

"We want to do something transformative, to move beyond current silicon-based solar technology," chemistry Professor Prashant Kamat of the university's Center for Nano Science and Technology said.

"By incorporating power-producing nanoparticles, called quantum dots, into a spreadable compound, we've made a one-coat solar paint that can be applied to any conductive surface without special equipment."

When the paint is brushed onto a transparent conducting material and exposed to light it creates electricity, the researchers said.

"The best light-to-energy conversion efficiency we've reached so far is 1 percent, which is well behind the usual 10 to 15 percent efficiency of commercial silicon solar cells," Kamat said.

"But this paint can be made cheaply and in large quantities. If we can improve the efficiency somewhat, we may be able to make a real difference in meeting energy needs in the future."

The International Energy Agency said a more intelligent use of solar energy could help meet a growing percentage of the world's energy needs.

Enough sunlight reaches the Earth in 90 minutes to meet the world's energy needs for a year if harnessed appropriately, the IEA said in a report from its headquarters in Paris.

"While solar energy resources are abundant, their use currently represents only a tiny fraction of the world's current energy mix," said report author Cedric Philibert.

"But this is changing rapidly and is being driven by action to improve energy diversification and security, mitigate climate change and provide energy access."

The IEA warns that concerns over cost have led some governments to make hasty policy decisions that could force a reversal of any gains in the use of solar energy.

The agency calls for "comprehensive and fine-tuned policies" that back a growing portfolio of solar technology. Given the right conditions, the IEA said, solar power could become a competitive energy source within 20 years.

"Integrating all solar technologies in a system-oriented policy approach will unlock the potential of solar energy within the broader set of low-carbon technologies needed for a future sustainable and more secure global energy mix," Paolo Frankl, head of the IEA's Renewable Energy Division, said in a statement.

2011年11月24日星期四

Arran Elderslie council think about solar panels for arena

Arran-Elderslie council wants more information before installing solar photovoltaic systems on two of its arena roofs.

Horizon Energy Solutions approached council several months ago with the renewable energy concept. At a meeting a few weeks ago, Mayor Paul Eagleson broke a tie vote of his council, giving Horizon the go-ahead to proceed with an assessment study on its facilities to determine the feasibility of the project and the anticipated kilowatts of energy that each facility could produce. Initial revenue estimates range from $13,000 to $18,750 per facility per year.

In a report to council last week, Ann McArthur, manager of parks, recreation and facilities in Arran-Elderslie said based on the company's assessment, Horizon is recommending that the roofs at the Chesley and Paisley arenas be re-coated prior to proceeding with its engineering study.

Projected cost of the re-coating is $30,000 for each facility.

The engineering study is needed to ensure the structures are physically capable of holding the weight of the solar panels and "to ensure the roof has a life that exists beyond the 20-year lease agreement."

Under the proposed lease agreement, Horizon would allow one free lift of the panels, should a major roof repair be required, however, Horizon wants the roofs re-coated prior to their feasibility study. The study would cost $10,000 per facility, and would be at the sole expense of the project proponent, McArthur's report stated.

Council deferred making a decision on the request saying it needs more information on the life expectancy of the existing arena roofs, what implications there would be to their insurance coverage, and the opinions of its fire chiefs on whether or not fire protection could be offered if there was a fire.

Eagleson admitted later council "is having second thoughts" about the proposed solar panel installation.

"We could use the revenue but is it going to be good?" asked Chesley ward councillor Doug Bell.

2011年11月21日星期一

China Bends to U.S. Complaint on Solar Panels but Plans Retaliation

Chinese solar panel makers plan to shift some of their production to South Korea, Taiwan and the United States in hopes of defusing a trade case pending against them in Washington, according to industry executives.

But at the same time, the Chinese industry is considering retaliating by filing a trade case of its own with China’s Commerce Ministry.

The most likely target would be American exports to China of polysilicon — a prime ingredient in solar panels — Chinese industry executives and officials said on Monday. American manufacturers exported about $873 million of polysilicon to China last year, nearly as much in dollar terms as the value of the solar panels that China shipped to the United States.

The Chinese moves come after the United States Commerce Department opened a trade case against China’s solar panel makers earlier this month, at the request of SolarWorld Industries America and six other American solar companies.

The Commerce Department said it was considering punitive tariffs of 50 to 250 percent on Chinese solar panels, based on preliminary evidence that China was “dumping” solar panels in the United States below the cost of making and marketing them. The department is also investigating whether the Chinese government is breaking international trade rules by subsidizing the export of solar panels — if such a finding was made, it could result in additional tariffs.

Having hired trade lawyers to advise them on the Commerce Department case, Chinese solar panel manufacturers are increasingly gloomy about their chances of winning it, said Ocean Yuan, the president of Grape Solar, a big importer of Chinese solar panels that is based in Eugene, Ore.

Mr. Yuan said that Grape Solar was already negotiating with several Chinese manufacturers, whom he declined to identify, to perform final assembly of solar modules in Oregon. That would be the last step in new supply chains the Chinese industry intends to set up that would start in China then run through South Korea and Taiwan in hopes of avoid any new tariffs.

But because final assembly of solar panels is relatively low-tech manual labor, any Chinese expansion into Oregon would be unlikely to add many valuable American jobs.

Currently, the only Chinese solar panel assembly site in the United States is near Phoenix and owned by Suntech Power. That plant has a capacity equal to about 3 percent of the American market for solar panels.

Even before the filing of the trade case, Suntech had begun preparations to increase output at that operation, planning to add a work shift and double the size of the factory. But that will expand the current work force to 260, from 110 now. And even then, its capacity would serve only a small fraction of the American market. By contrast, companies based in China supplied more than 40 percent of the American market for installed panels in the third quarter of this year, according to GTM Research, a renewable energy consulting firm based in Boston.

Meanwhile, the Chinese solar panel industry is seeking legal advice on filing its own antidumping and antisubsidy trade case against the United States, industry executives in Beijing said Monday.

The most likely target would be American exports of polysilicon, the main material used in making conventional solar panels, said Wang Shijiang, a manager at the China Photovoltaic Industry Alliance based in Beijing.

The manufacture of polysilicon requires enormous amounts of energy — so much electricity that it typically takes the first year of operation of the panel to generate as much power as was required to make the polysilicon in it. The process requires superheating large volumes of material in electric-arc furnaces, including the melting of quartzite rock at more than 3,600 degrees Fahrenheit.

2011年9月26日星期一

Sunny outlook for emirates in drive for more solar energy

Shiny blue panels are harvesting the sun's energy on Abu Dhabi's roofs, and Dubai is soon to unroll its own solar programme, officials said yesterday.

The transition to clean energy will be hastened by falls in the price of solar-panel technology, already down by half from three years ago, say industry executives.

"The decline in the cost of solar energy over the past few years has made our solutions much more competitive in the power portfolio," said Sami Khoreibi, the founder of Enviromena, a UAE solar company that installed some of the roof panels.

"If you look at any of the other sources of energy, they're only going up in price."

Solar power has taken longer to find support among investors in the region because it is regarded as more expensive than conventional fuel..

But the falling price of solar technology, driven by competition from Chinese companies, is set to speed up its adoption.

UAE officials have set ambitious solar targets - 7 per cent in Abu Dhabi by 2020 and 5 per cent in Dubai by 2030. Yesterday Masdar, the Abu Dhabi Government's clean energy company, announced a milestone in reaching that goal: 2.3 megawatts of solar roof panels. A total of 500 megawatts of roof panels is planned for the capital by the end of the decade.

It "is clearly the first step toward a larger solar incentive programme", said Mr Khoreibi.

Dubai could install as much as 90 megawatts of solar power to reach its 1 per cent renewables target in the next nine years.

"We're monitoring the technology on solar and renewables," said Nejib Zaafrani, the chief executive of the Dubai Supreme Council of Energy, the policymaking body. "As the technology evolves on improving the cost and improving the efficiency in terms of the value, then we will change."

Dubai is studying sites for potential solar installations would announce a "very big" solar project soon, said Saeed Al Tayer, the chief executive of the Dubai Electricity and Water Authority.

But solar companies and investors say they need a guarantee that solar power will fetch good prices.

2011年9月8日星期四

Solar Industry “Darwinism” Weeding Out Weaker Companies

Solar panel manufacturer Solyndra, which recently filed for bankruptcy, got special treatment from the Obama administration, some have alleged, since the company’s $535 million in federally guaranteed loans had much lower interest rates than those of other green energy companies, according to an investigative report.

The FBI raided Solyndra’s office, although it would not comment on the reason. The company shut without giving notice to its employees and contractors, which many large companies are legally required to do.

However, Lewis Milford of the Clean Energy Group argued critics are inconsistent in highlighting Solyndra’s failure, since there are many examples of failure in government projects—and that a high rate of failure is inevitable in innovative fields. Overall, the Loan Guarantee Program has performed well, and Solyndra’s failure is not a reason to abandon it, Forbes argued.

Solyndra is only one of many solar energy companies around the world struggling recently, due in large part to rising costs of materials and weaker-than-expected demand for panels, which have led to a sharp rise in mergers and acquisitions compared with last year.

Germany has long been a solar powerhouse, but one of its companies—SolarWorld—is also having trouble, and is shutting down factories in Germany and the U.S. and consolidating manufacturing. Another German solar company, Solon, is shutting an Arizona plant and laying off workers.

All this activity “is Darwinism at work in business,” said an executive of manufacturer Abound Solar.

Nonetheless, large solar projects are moving ahead. The U.S. has offered a loan guarantee for putting solar panels on military housing, which could double the number of residential rooftop arrays in the country.

With solar panel costs falling, the European Photovoltaic Industry Association said, solar could be competitive with conventional energy within a couple of years in some markets, and across Europe by 2020.

Also, a new projection from the International Energy Agency said in 50 years’ time, solar energy could provide more than half the world’s power.

Iran joined the list of nuclear countries by connecting its first nuclear power plant to the grid last week, according to the country’s official media.

Also, the International Atomic Energy Agency reported Iran began running upgraded centrifuges. Iran also offered to allow inspectors “full supervision” of its nuclear activities for the next five years, in exchange for lifting sanctions.

Iran has reportedly tested weapons systems, which some experts said cast doubt on Iran’s claim that its nuclear program is limited to producing electricity. But arms expert Mark Fitzpatrick of the International Institute for Strategic Studies said that without proof, it is too soon to jump to the conclusion Iran is pursuing nuclear weapons. Nonetheless, in discussions at the United Nations, several countries kept pressure on Iran to suspend uranium enrichment until a monitoring deal is worked out.

2011年3月27日星期日

Solar canopy energizes Cincinnati Zoo

Visitors to the Cincinnati Zoo are marveling at a new sight: Nearly 4 acres of solar panels have been installed over a vast span of the parking lot.


Billed as one of the largest public urban solar displays in the country, the $11 million solar "canopy" will do much more than help control the zoo's utility bills and shelter visitors from the elements when it's turned on in mid-April, developers say.

While it puts solar technology on display, the project also "will help put Cincinnati on the map as a national leader in the adoption and promotion of clean energy," said developer Steve Melink, Clermont County businessman and renewable energy advocate.

Workers finished installing the last solar panels Friday. The project has already sparked calls from more than a dozen zoos from as far away as California and Oregon interested in the project and how it was put together.

Mark Fisher, the zoo's senior director of facilities, planning and sustainability, said it's creating a buzz from visitors as well. "Some people wonder what the heck it is, and those who have heard about it are surprised at how big it is," he said.

According to Melink, the project consists of 6,400 photovoltaic solar collection panels assembled on more than 100 metal arrays, 15 to 18 feet high. They cover about 800 of the 1,000 parking spaces at the zoo's main entrance. The project is designed to produce 1.56 megawatts of electricity, about 20% of the zoo's annual need and enough to power 200 homes.

It isn't the largest solar project in Ohio. The Wyandot Solar farm, a utility-sponsored project near Upper Sandusky, covers about 80 acres and is designed to produce more than 10 megawatts of electricity.

Because the zoo's parking canopies are so public, officials say it will dramatically spur interest in solar here.

"The education aspect is worth a lot," says Raju Yenamandra, vice president at SolarWorld, a German-based company that produced the zoo's solar panels at its plant in Hillsboro, Ore. He thought so highly of the zoo project that he accelerated the delivery schedule for the zoo's solar panels, so the project would be ready this spring.

"When you think of the number of people who visit the zoo (about 1.3 million annually), particularly younger kids, the educational aspect will be fantastic," he said.

Solar canopies, which harness the sun's rays for electricity and provide shelter from its harsh rays, have been popular in warmer climates such as Southern California and Arizona. They're gaining in popularity in other parts of the country in the face of rising energy prices and government incentives to make solar technology more affordable.

"We're bidding multiple projects all over the country," said Dana Rudolph, president of ProtekPark Solar, which fabricated and installed the metal structures holding the solar panels. ProtekPark, a sister company of greenhouse constructor Rough Brothers, has been building parking canopies for about 10 years but lately found solar projects are the fastest-growing part of its business. It recently supplied metal canopies for solar projects at two community colleges in New Jersey.

The Cincinnati Zoo project grew out of a casual meeting between Fisher, Melink and Jeremy Chapman, Melink's business development manager, at a green building conference in Phoenix two years ago.

Fisher, who was looking for opportunities to expand the zoo's growing green profile, said Melink was looking for a signature project to demonstrate its developing solar installation business: "I told them: I have a parking lot."

Melink, which is developing a smaller pre-engineered solar array system for homes and businesses, was intrigued.

"We want to make a difference," he said. "And this was the scale we wanted."

The biggest hurdle was structuring the project's financing.

"It was about 99% financing and 1% engineering," Melink said.

The project relies on financing through a combination of federal New Market Tax Credits and federal energy tax credits through PNC Bank. It relies on cash from the tax credits, sales of electricity over the next seven years to the zoo and selling the renewal energy credits generated by the investment to Akron-based FirstEnergy.

Fisher said that initially the parties couldn't make the deal work financially until the non-profit Uptown Consortium and New York City-based National Development Council agreed to contribute New Market Tax Credits allocated to them toward the project.

Fisher said the project allows the zoo to lock in the price for about 20% of its electricity at about 8 cents a kilowatt hour for the next seven years. The agreement gives the zoo the option to buy the system in the eighth year if it chooses.